Tuesday 7 July 2015

help out Brian

Brian:  This particular stretch of sidewalk needs to be repaired now ,during the summer before the weather gets bad. I think that a smooth asphalt surface should be applied like that which already exists on the stretch of sidewalk where ETS bus stop #5963 is located. The asphalt surface is smooth and comfortable for wheelchair transporation.  In the winter the sidewalk from along the west side of 178 street from 76 Avenue to 69 Avenue is not properly cleared of snow fro the entire winter even when I make a phone call to the city to correct it. The city does not clear the snow nor enforce the bylaw to clear that section of sidewalk for the entire winter. as a result the sidewalk is impossible to use as wheelchair transportation.

No comments:

Post a Comment